New Wexford Garda Divisional Head Quarters

Description:

This current project involves the construction of a new 4,000 sqm Garda Divisional Headquarters building on a site circa2.79 hectares.
The development consists of a three-five storey building, with flat roofs along the Mulgannon Road, Wexford, stepping down to a single storey at the rear of the site. It also includes a standalone single storey heavy goods vehicle garage and stores.
The main structure of the building includes structural steel, in-situ concrete, precast floors and external brickwork / blockwork on piled foundations.
The Ground Floor will consist of Public entrance, reception, public office, Garda offices, staff rooms, waiting rooms, parade rooms, Interview rooms, ID parade room, Cell block and ancillary accommodation. The First Floor will consist of Garda offices, staff rooms, meeting rooms, CPDU Classrooms and Divisional and District Clerks Offices. The Second Floor will consist of Garda offices, staff rooms, meeting rooms, Major incident room, Rest Room and Traffic Corp Offices. The Third Floor will consist of Male and Female Changing Rooms, Fitness Room and the fourth floor will consist of Electrical and Mechanical Plant rooms.
The major Site development works include internal site roadways, a green access road to parts of the site for the fire services, 124 parking spaces for cars and h.g.v’s; sheltered bicycle rack, metal gates, signage, extensive hard and soft landscaping and lighting, vehicular and pedestrian entrances off the Mulgannon Road; the provision of a new 13 m telecommunications mast on the roof of the 5-storey building; the provision of new railings, fencing and boundary wall treatments to a height of 3 metres.
A new separate foul drain will connect to the existing public drainage system and all surface water will be attenuated on site prior to discharge to the existing surface water system.