SLANE CASTLE WHISKEY DISTILLERY & VISITOR CENTRE PROJECT

Description:

The scope of works is briefly summarised below:-

Construction of new Co-Products Building, two storey extension to existing Stables building, rebuilding of barn structure along with installation of distillation and
brewing equipment.

Renovation and refurbishment of existing historic buildings surrounding two courtyards.

Installation of below ground services for all buildings including outfalls and intakes to the River Boyne for water, boreholes and associated pipework and pump which deliver water to the distillery.

Construction of new road access from N59 along with new internal roadways on Castle grounds and associated carpark for visitors.