Shire Pharmaceuticals - LAC Project Fit-Out Works

Contract Duration

9 Months

Contract Value

€7.5M

Client

Shire Pharmaceuticals

Architect

Jacobs Engineering

Civil / Structural Engineer

Jacobs Engineering

Services Engineer

-

Quantity Surveyor

Jacobs Engineering

Description

The development on the Bio-pharmaceutical Manufacturing Facility comprises of a main facility block with associated ancillary buildings. The main campus block consists of three buildings adjoining together to form the main facility for the site. The new facility block includes a new warehouse building, a laboratory, administration, canteen building and a manufacturing building.
The new Bio-pharmaceutical building will be designed to support multi-product operations on a campaign basis.

LAC Project Fit-Out Works
The scope of the works package is for the architectural Fit-Out (non-cleanroom) installation within the LAC Building. The project envisages the delivery of a state of the art of fit-out of the labs, offices, canteen and reception area for this flagship development by Shire which will be finished to the most exacting quality standards. The project will be delivered through the use of BIM which will facilitate the extensive coordination of services with architectural fit out. Duggan Brothers experienced on-site BIM team will play an instrumental role in achieving this.